Abdominal pain with hemodynamic instability critical pathways
Jump to navigation
Jump to search
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Critical Pathways
| abdominal pain critical pathways |
| Hemodynamically stable | Yes | No |
Definition
- Hemodynamic status
Action items
- Stabilize the patient by IV challenge.