Back pain critical pathways

Revision as of 20:33, 29 July 2020 by WikiBot (talk | contribs) (Bot: Removing from Primary care)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Critical Pathways

back pain critical pathways
Question 1 ANSWER 1 ANSWER 2

Definition

  • Back pain is pain felt in the back that may originate from the muscles, nerves, bones, joints or other structures in the spine.

References

Template:WikiDoc Sources