Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) m (Gerald Chi moved page Abdominal pain smart algorithm to Abdominal pain physician extender algorithm without leaving a redirect) |
Gerald Chi (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
==Approach== | ==Approach== | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=lightyellow |[[Abdominal pain | | bgcolor=lightyellow |[[Abdominal pain physician extender algorithm|Abdominal Pain Smart Algorithm]] | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=lightyellow |Hemodynamically Stable?||bgcolor=lightgray |[[Abdominal pain duration | | bgcolor=lightyellow |Hemodynamically Stable?||bgcolor=lightgray |[[Abdominal pain duration physician extender algorithm|Yes]]||bgcolor=lightgray |[[Abdominal pain with hemodynamic instability physician extender algorithm|No]] | ||
|} | |} | ||
Revision as of 14:46, 2 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal Pain Smart Algorithm |
Hemodynamically Stable? | Yes | No |
Definition
- Abdominal pain is pain felt anywhere between the chest and the groin.
- Immunocompromised and elderly patients may have atypical patterns of presentation.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.